
MV2 Machine Integration Strategy Assessment
Step 1 of 2 — Strategy & Readiness Assessment | MV2 Manufacturing Execution System
Purpose of This Assessment: Before collecting machine-level data, ISE needs to understand
your overall Machine Integration strategy, goals, and shop floor environment. Your responses will help
our team evaluate how your objectives and existing infrastructure align with MV2's Machine Integration capabilities, ensuring we recommend the right approach
before moving to Step 2.
Instructions: Answer each question as thoroughly as possible. If you are unsure of an answer, provide the information you do know and leave the rest blank. Our team will follow up as needed. For the technical sections, your controls engineer or IT contact may be the best person to assist.
Instructions: Answer each question as thoroughly as possible. If you are unsure of an answer, provide the information you do know and leave the rest blank. Our team will follow up as needed. For the technical sections, your controls engineer or IT contact may be the best person to assist.
🔒 Confidentiality Notice: All information submitted through this assessment is strictly confidential and will only be used
by ISE to evaluate your Machine Integration requirements. Your data will not be shared with
any third parties.
🏚 Company Information
🎯 Section 1 — Goals & Objectives
e.g. generate reports, KPI dashboards, perform transactions in MV2 that go back to ERP. Please be as specific as possible and prioritize if known.
⚙ Section 2 — Machines & Software
e.g. CNC, saws, bending machines, forming machines, plastic injection molding machines, ovens, etc.
🔌 Section 3 — Controls, Connectivity & Access
These are more technical questions. Your controls engineer or IT contact may be the best person to answer this section.
Please provide make and model if known.
Wired or wireless? On the plant network or an isolated / air-gapped network?
e.g. an API, SDK, or direct database access.
👥 Section 4 — Shop Floor Workflow
Can multiple orders run at the same time on one machine? Can one operator run multiple machines simultaneously?
All fields are optional — provide as much detail as you can. Once submitted, ISE will review your responses and follow up to schedule a discovery call before sending Step 2: Machine Data Collection.